Total Made to Date
This upper panel will display the totals of all known payments made to the subcontractor, the total cost of any materials claimed and the total deductions made from these payments, from April 2014 or the date of registration (if it is later).
If there is a text entry in this panel in red stating ‘Totals are based on readable data only’ this will indicate that the entries recorded here are incomplete (and likewise the information contained within the panel below). There will also be an [!] alongside the relevant total figure(s) to indicate that these total(s) do not include any minus figures or unreadable sums - as shown on the contractors return from which these details are extracted.