$2 MILLION BEREKUA BYPASS COMPLETE $2 MILLION BEREKUA BYPASS COMPLETE The Berekua Bypass Project in Grand Bay has been completed as Government continues to build resilient communities. The project, which was completed within five months is part of Government’s efforts to safeguard its people through the hurricane season. The project was built at a cost of over two million EC dollars and included construction of a twelve metre box culvert, an upper wing wall, lower wing wall, upper drain channel, lower drain channel, rigid pavement, slipper drains and river dredging both upstream and downstream. Parliamentary Representative for the Grand Bay constituency, Hon. Edward Registe stated that the Berekua bypass project came after the area suffered major damages to include landslides and flooding during the passage of Hurricane Maria in 2017.