23 Jul 2021 / 13:18 H. -Bernama KUALA LUMPUR: A total of 933 of the 1,142 construction sites that are in operation nationwide since the implementation of the movement control under the National Recovery Plan last June 1 complied with the stipulated standard operating procedures (SOP), said Works Minister Datuk Seri Fadillah Yusof. ( pix) He said a total of 5,766 construction sites were inspected nationwide during the same period with 4,624 of them found not operating. “Of the total construction sites in operation, 209 of them did not comply with the SOPs and were ordered to close, and the reason being that they did not have the letter of permission to operate from the Ministry of International Trade and Industry (MITI) and also the local authorities,“ he told reporters after visiting a few construction sites in the federal capital today.