<p><span>The Expert Panel composed of ENTSO-E, Polskie Sieci Elektroenergetyczne S.A. (PSE, the Polish Transmission System Operator (TSO)), ACER and relevant National Regulatory Authority (NRA) representatives publish their Final Report on the Local Grid Incident in Rogowiec (Poland) substation that occurred on 17 May 2021, issued in accordance with the System Operation Guideline (SO GL) and the Incident Classification Scale (ICS) Methodology. </span></p>