<p><span>Massive investment at efficient cost in energy infrastructure is needed in Europe to deliver on the energy transition. Every two years, ACER provides a non-binding opinion on the draft grid plans (called Ten-Year Network Development Plans or TYNDPs) proposed by the network operators.</span></p>