Biloxi moves forward with next Boardwalk project : vimarsana

Biloxi moves forward with next Boardwalk project


Biloxi moves forward with next Boardwalk project
Biloxi moves forward with next boardwalk project
By Desirae Duncan | February 20, 2021 at 5:33 PM CST - Updated February 20 at 8:08 PM
BILOXI, Miss. (WLOX) - Biloxi’s next boardwalk project could provide a solution to an ongoing problem. The city is working to build a 1-mile, 10-foot wide boardwalk that will stretch from the Small Craft Harbor to Oak Street.
Biloxi Mayor Andrew “Fofo” Gilich proposed the idea of building the boardwalk right on top of the sea wall.
“What he’s proposing to do is to take this piece of concrete which has an 18 inch knee wall on it. What that’s designed to do is keep that sand off of Highway 90, and if you notice how they fit right on just like that. The hope is that it’s going to keep the sand on the beach where it belongs and it provides a beautiful seawall walkway.” said Vincent Creel, Biloxi Public Affairs Manager.

Related Keywords

Vincent Creel , Andrew Fofo Gilich , Biloxi Public Affairs Manager , Army Corps Of Engineers , Small Craft Harbor , Mayor Andrew , Biloxi Public Affairs , Harrison County , Army Corps , South Mississippi , Biloxi , Boardwalk , Oak Street , வின்சென்ட் கிரியேல் , பிலோக்சி பொது வாழ்க்கைத்தொழில்கள் மேலாளர் , இராணுவம் கார்ப்ஸ் ஆஃப் பொறியாளர்கள் , சிறிய கைவினை துறைமுகம் , மேயர் ஆண்ட்ரூ , பிலோக்சி பொது வாழ்க்கைத்தொழில்கள் , ஹாரிசன் கவுண்டி , இராணுவம் கார்ப்ஸ் , தெற்கு மிசிசிப்பி , பிலோக்சி , போர்டுவாக் , ஓக் தெரு ,

© 2025 Vimarsana