Bold Ventures Inc. reports that its initial diamond drill program at the Traxxin Gold Project has commenced. The program will consist of approximately 1000 m of NQ diameter drill core in 5 holes. The program is designed to test beneath the Main Zone where previous drilling has traced a gold-bearing structure that is over 300 m in strike length and has a well-defined, sheared, quartz vein surface exposure from 15 to ...