Bureaucratic marginalisation of queer students really still going strong, huh? A dedicated queer space on campus has been in the works since 2018 and, more than two years down the track, is still facing issues. As previously reported by Critic, the space was meant to open on the first floor of the University Union building near the Terrace Lounge by the end of April. It would include furniture, decorations, amenities like a kitchen space, and would provide a secure and supportive physical space for the queer community on campus. According to Property Services Division Acting Director Graeme Marshall at time of print, “the space should still be usable the end of this month as most of the refit is finished.”