auckland.scoop.co.nz » Connecting The Dots On The North

auckland.scoop.co.nz » Connecting The Dots On The Northern Corridor Improvements Project: Excavation Work To Join SH1 And SH18 Begins


Press Release – NZTA
From next week there will be lane changes for people using the Northern Motorway as 16,000m3 of material, the equivalent of six Olympic sized swimming pools,is excavated to create an underpass providing a direct connection between SH1 and SH18 as part of Auckland’s Northern Corridor Improvements (NCI) project.
“The underpass will provide a direct motorway to motorway connection for people travelling from the north heading west. When NCI is complete, it will be the final link of the western ring route”, says Waka Kotahi NZ Transport Agency National Manager Infrastructure Delivery Andrew Thackwray.
Construction of the underpass began just over two years ago and is being built using a ‘top-down’ construction method which means that the roof and walls are constructed first and then the material under the roof excavated and taken away.

Related Keywords

Auckland , New Zealand , Andrew Thackwray , Andy Thackwray , Waka Kotahi Nz Transport Agency National , Press Release , Northern Motorway , Northern Corridor Improvements , Waka Kotahi , Upper Harbour Highway , North Shore , Northern Busway , Western Ring Route , ஆக்லாந்து , புதியது ஜீலாந்து , ப்ரெஸ் வெளியீடு , வடக்கு மோட்டார் பாதை , வடக்கு தாழ்வாரம் மேம்பாடுகள் , வாக கோட்டாஹி , மேல் துறைமுகம் நெடுஞ்சாலை , வடக்கு கரை , வடக்கு பஸ்வே , மேற்கு மோதிரம் பாதை ,

© 2025 Vimarsana