The Chief Secretary also reviewed the status of track upgradation works on Baltal and Chandanwari routes, improvements at the access control gates, establishment of temporary camps, shelter sheds, health/medical camps and Emergency Operation Centers (EOCs) at various locations. He also reviewed the provisions of drinking water supply, lighting, LPG, ration, Medicine and mobile connectivity besides establishment of Joint Control Rooms as per NDMA suggestion. He enjoined upon the administration to undertake preparations for an expected footfall of 6 lakh yatris this year. To further ensure secure passage of pilgrims, directions were issued to appropriately widen walking tracks, install railings, and construct retaining walls with special focus on laying down pre-fabricated cement tiles on tracks from Baltal.