The actual construction of the pavilion and plaza is scheduled to begin in August. Posted: May 28, 2021 2:02 PM Posted By: Chelsea Hunt EUGENE, Ore. – A $9.8 million project is underway in downtown Eugene, and it begins with a massive demolition of the Butterfly Parking Lot. It’s happening on Oak Street between East 7th and 8th avenues.