As part of preparations for the autumn-winter period of 2023/2024, the operator of the electricity distribution system DTEK Kyiv Grids expects to repair and upgrade 832 power facilities, including 12 high-voltage substations, and 100 km of overhead and cable lines, CEO of the company Denys Bondar has said.