Aerial view of the proposed wetlands to be enhanced. (PRRD) DAWSON CREEK, B.C – Ducks Unlimited expanded on its plans to restore wetlands in Upper Cache Thursday, with provincial biologist Bruce Harrison presenting a package of information to the Peace River Regional District. Three small earth dams are proposed on an existing ditch system on private farmland near Highway 29 and Szoo Road, just west of the Attachie lookout and rest stop. While the plan remains unendorsed by directors, the project is planned to offset the loss of wetlands to the Site C reservoir. “This was once a natural area, very similar to Watson Slough. Over the years it was drained so it makes sense to do a project here,” Harrison said.