EDC orders 29MW power generation system for BacMan geothermal plant By JON VIKTOR D. CABUENAS, GMA News Published February 3, 2021 12:09pm Lopez-led Energy Development Corp. (EDC) has ordered a 29-megawatt (MW) binary cycle power generation system from Turboden S.p.A -- a joint company of Italy-based Mitsubishi Heavy Industries Ltd. and Mitsubishi Power Ltd. -- for the local firm's geothermal plant in Palayan. Turboden on Wednesday said it will provide the complete power generation system, which will add to the existing 120MW flash type geothermal power plant owned and operated by EDC subsidiary Bac-Man Geothermal Inc. The project completion and operation startup have been set at the end of 2022.