Sunday, 27 Jun 2021 03:06 PM MYT A passenger dons a face mask during a ride on the LRT train in Kuala Lumpur June 1, 2021. — Picture by Firdaus Latif Follow us on Instagram and subscribe to our Telegram channel for the latest updates. KUALA LUMPUR June 27 — The first two out of the 27 new train sets under the Kuala Lumpur Additional Vehicles 27 (KLAV27) project for the Kelana Jaya Light Rail Transit (LRT) line began operations yesterday after completing their testing and commissioning exercise. Prasarana, in a statement today said that the two sets of four-coach Bombardier Innovia Metro 300 trains are equipped with several enhanced features compared to the 14 sets of the same model trains used since 2018 and obtained under the KLAV14 initiative.