Food waste treatment system installed : vimarsana.com

Food waste treatment system installed


Food waste treatment system installed
Updated:
Updated:
Share Article
AAA
Alby John Varghese, Regional Deputy Commissioner - South, Greater Chennai Corporation, inaugurates the plant. Photo:
  | Photo Credit:
V. Bharath.
The office of Zone 13 of Greater Chennai Corporation (GCC) has installed a plant for the treatment of food waste at Amma Unavagam (Amma canteen) located on the premises of a Greater Chennai Corporation Primary School in Indira Nagar, Adyar. The plant, developed by Avris Environment Technologies Limited Liability Partnership (LLP), a Chennai-based start-up, was inaugurated by Alby John Varghese, Regional Deputy Commissioner - South, GCC recently on February 2.
V. Bharath, director of the start-up says,“The plant can take in 75 kg of waste. The waste is crushed and turned into a slurry, which further gets converted into bio-gas. This fuel is piped to the stove in the kitchen and used for cooking.”

Related Keywords

Adyar , Tamil Nadu , India , Chennai , Amma Unavagam , Ravi Ayyangar , Srikant Sitaraman , Alby John Varghese , Avris Environment Technologies Limited Liability Partnership , Greater Chennai Corporation , Greater Chennai Corporation Primary School , Indiranagar , Regional Deputy Commissioner , Solid Waste Management , Zone 13 , Amma Canteen , அடையாறு , தமிழ் நாடு , இந்தியா , சென்னை , அம்மா உணவகம் , ரவி அய்யங்கர் , ஆல்பி ஜான் வர்கீஸ் , அதிகமானது சென்னை நிறுவனம் , அதிகமானது சென்னை நிறுவனம் ப்ரைமரீ பள்ளி , இந்திரணகர் , பிராந்திய துணை ஆணையர் , திட கழிவு மேலாண்மை , ஸோந் , அம்மா உணவகத்தில் ,

© 2025 Vimarsana