Visuals from J-K's Poonch (ANI) High tension power line restored in J-K's Poonch 7 years after damage due to floods ANI | Updated: Jul 02, 2021 06:41 IST Poonch (Jammu and Kashmir) [India], July 2 (ANI): Seven years after it got damaged due to the havoc caused by the 2014 floods, 132 KV high tension line in Poonch was restored on Thursday. During the massive flood in 2014, the 132 KV power line towers were washed away. Now after seven years the power line is restored and tested in the Chandak power grid station. More than two lakh people of Poonch district will be benefited from the 132 KV powerline supply.