For collection of toll at Badarpur Elevated Fee PlazaMEP Infrastructure Developers has received the Work Order dated 15 February 2021 from the National Highways Authority of India (NHAI) and have commenced the tolling operations from 16 February 2021 (8.00 Hrs) for the Project of collection of user fee for Badarpur Elevated Fee Plaza at Km. 18.700 and Km. 20.200 on Section from Km. 16.100 to Km. 20.500 of NH-2 in the State of Delhi and Haryana. The period of the said Contract is 3 (Three) Months (from 16 February 2021 (8.00 Hrs) to 16 May 2021 (8.00 Hrs). Powered by Capital Market - Live News (This story has not been edited by Business Standard staff and is auto-generated from a syndicated feed.)