MEP Infrastructure Developers receives contract from NHAI :

MEP Infrastructure Developers receives contract from NHAI


For collection of toll at Badarpur Elevated Fee PlazaMEP Infrastructure Developers has received the Work Order dated 15 February 2021 from the National Highways Authority of India (NHAI) and have commenced the
tolling operations from 16 February 2021 (8.00 Hrs) for the Project of collection of user fee for
Badarpur Elevated Fee Plaza at Km. 18.700 and Km. 20.200 on Section from Km. 16.100 to
Km. 20.500 of NH-2 in the State of Delhi and Haryana. The period of the said Contract is
3 (Three) Months (from 16 February 2021 (8.00 Hrs) to 16 May 2021 (8.00 Hrs).
Powered by Capital Market - Live News
(This story has not been edited by Business Standard staff and is auto-generated from a syndicated feed.)

Related Keywords

State Of Delhi , Delhi , India , Badarpur , Gujarat , Haryana , , Authority Of India , Badarpur Elevated Fee Plazamep Infrastructure Developers , Badarpur Elevated Fee , Work Order , National Highways Authority , Badarpur Elevated Fee Plaza , Capital Market , Toll Roads , Badarpur Border Metro Station , Draft Badarpur , New Delhi , Transport , Land Transport , Toll , National Highways Authority Of India , Ckm , நிலை ஆஃப் டெல்ஹி , டெல்ஹி , இந்தியா , படர்பூர் , குஜராத் , ஹரியானா , அதிகாரம் ஆஃப் இந்தியா , படர்பூர் உயர்த்தப்பட்டது கட்டணம் , வேலை ஆர்டர் , தேசிய நெடுஞ்சாலைகள் அதிகாரம் , படர்பூர் உயர்த்தப்பட்டது கட்டணம் ப்லாஸ , மூலதனம் சந்தை , சுங்கவரி சாலைகள் , படர்பூர் எல்லை மெட்ரோ நிலையம் , வரைவு படர்பூர் , புதியது டெல்ஹி , போக்குவரத்து , நில போக்குவரத்து , சுங்கவரி , தேசிய நெடுஞ்சாலைகள் அதிகாரம் ஆஃப் இந்தியா , கி.மீ. ,

© 2025 Vimarsana