Ongoing Construction: 1. **New Salam Highway Widening (Phase 2):** - Currently widening from the I24 Interchange to Old Fort Parkway. - Expanding from three lanes to five lanes. - Expected completion in spring 2024. 2. **Beesy Road River Rock Boulevard Connector (2024):** - Construction of a bridge over Stones River connecting Beesy Road to River Rock Boulevard. - A three-lane curb and gutter roadway with sidewalks and a multi-use path. ...