NHSRCL signs 2nd agreement with L&T for Mumbai-Ahmedabad rai

NHSRCL signs 2nd agreement with L&T for Mumbai-Ahmedabad rail project


NHSRCL signs 2nd agreement with L&T for Mumbai-Ahmedabad rail project
​ By
IANS
|
Published on
​ Wed, Dec 16 2020 20:03 IST
|
​ 13 Views
 
New Delhi, Dec 16 : The National High Speed Rail Corporation Limited (NHSRCL) on Wednesday signed the second contract agreement with Larsen and Toubro Limited for the design and construction of 88 km of viaducts between Vadodara and Ahmedabad in Gujarat, including the construction of elevated high speed rail stations at Anand/Nadiad, for the 508 km Mumbai- Ahmedabad High Speed Rail Corridor (MAHSR).
With the signing of a fresh agreement, the NHSRCL has till date awarded civil contracts for the construction of 92 per cent of MAHSR alignment in Gujarat (325 km out of 352 km in Gujarat), which also includes five HSR stations -- Vapi, Billimora, Surat, Bharuch, Anand/Nadiad, a train depot at Surat and one mountain tunnel of 350 metres.

Related Keywords

Surat , Gujarat , India , Ahmedabad , Japan , Vapi , India General , Vadodara , Bharuch , New Delhi , Delhi , Anand Nadiad , Achal Khare , Narendra Modi , Shinzo Abe , National High Speed Rail Corporation Limited , Toubro Limited , High Speed Rail Corridor , Zaroli Village , Maharashtra Gujarat Border , Director Achal Khare , Minister Narendra Modi , Japan Premier Shinzo Abe , சூரத் , குஜராத் , இந்தியா , அஹமதாபாத் , ஜப்பான் , வப்பி , இந்தியா ஜநரல் , வதோதரா , பருச் , புதியது டெல்ஹி , டெல்ஹி , ஆனந்த் நாடியத் , அச்சால் கரே , நரேந்திர மோடி , தேசிய உயர் வேகம் ரயில் நிறுவனம் வரையறுக்கப்பட்டவை , டப்ரோ வரையறுக்கப்பட்டவை , உயர் வேகம் ரயில் தாழ்வாரம் , ஜரொளி கிராமம் , மகாராஷ்டிரா குஜராத் எல்லை , இயக்குனர் அச்சால் கரே , அமைச்சர் நரேந்திர மோடி ,

© 2025 Vimarsana