(2) VANCOUVER, BC / ACCESSWIRE / February 3, 2021 / Orsu Metals Corporation (TSXV:OSU) ("Orsu" or the "Company") is pleased to update on the results of the first phase of pilot mining at its Sergeevskoe project (see news release September 29, 2020). From September 7, 2020 to November 28, 2020 (First Phase of pilot mining) the Company and Alexandrovskoe gold mine, its primary contractor ("Contractor"), extracted and processed 176 000 tons of mineralized material from Sergeevskoe. The average grade of the mineralized feed material as assayed at the entrance to the processing plant over this period has been 1.41 grammes per ton ("g/t") gold after mining dilution and mining loss. This is consistent with the geological model of the deposit and grade control drilling (see press release August 25, 2020).