From left: Ossining Supervisor Dana Levenberg; Adriane Pizzuti, Maryknoll’s director of HR services, and Father Raymond Finch, Maryknoll’s superior general, at the May 4, 2021, groundbreaking. Photo by Robert Brum A giant crane-mounted corkscrew was the center of attention during the recent groundbreaking of Maryknoll’s solar power project, which will install more than 2,000 energy-generating panels on the Ossining campus. The enormous piece of apparatus that looked like it could bore down to the Earth’s core is being used to drill 14 feet below ground to accommodate the foundations for six canopies on two parking lots at the Ryder Road campus.