Penang Bridge Lanes Closed For 3 Months After 2 Fires This W

Penang Bridge Lanes Closed For 3 Months After 2 Fires This Week


 channel for the latest stories and updates.
Several lanes on the iconic Penang Bridge may be closed to traffic for up to three months in order to repair electrical cables running under the structure which caught fire twice this week.
Firefighters were rushed to put out two separate flames which occurred under the bridge at kilometre 3.2 at around 4pm Tuesday (22 February) and again at around 9am the following morning (23 February).
Video believed to have been captured by motorists showed black smoke coming from the divider separating the lanes to and from the island as authorities manned the area.
Kabel elektrik di bawah Jambatan Pulau Pinang terbakar jam 4.20 petang, mengeluarkan asap menerusi saluran udara di atas Jambatan. @bombaJBPM tiba di lokasi, namun tiada laluan ke bawah. Pasukan Tindakan Kecemasan mencuba akses lain untuk kerja-kerja pemadaman.@BuletinTV3pic.twitter.com/NBk1wTKg48— Selwam Arjunan ���� (@SelwamNewsMPB) February 22, 2021

Related Keywords

Bukit Tengah , Pulau Pinang , Malaysia , Tenaga Nasional Berhad , Bayan Mutiara , Selwam Arjunan , Sultan Abdul Halim , Pasukan Tindakan Kecemasan , , Penang Bridge , Jambatan Pulau Pinang , Tindakan Kecemasan , Sultan Abdul Halim Muadzam Shah Bridge , Penang Second Bridge , புலௌஉ பினாங் , மலேசியா , சுல்தான் அப்துல் ஹலிம் , பினாங்கு பாலம் , பினாங்கு இரண்டாவது பாலம் ,

© 2025 Vimarsana