Potential zinc producer continues development plans : vimars

Potential zinc producer continues development plans


Arctic Journal
NWT
Osisko Metals 2021 exploration and development plans for Pine Point focus on continuing to de‐risk the project and bring further improvements to the 2020 Preliminary Economic Assessment (“PEA”). 
Drilling that began January 14 focused on infill and extension drilling in the Western Zone with the objective of converting the bulk of three high‐priority prismatic deposits to the Indicated Resource category. 
Hydrogeological studies and tests planned across the property to further refine the dewatering model used in the 2020 PEA could lead to substantial water management cost reductions over the life of the mine. 
Pine Point is a Tier 1 zinc development project. Pine Point combines excellent open pit metal grades with available infrastructure and projected low operating costs, pointing to the potential for a “Top 10” global zinc producer. 

Related Keywords

Great Slave Lake , Northwest Territories , Canada , Pine Point , , Osisko Metals , Economic Assessment , Western Zone , Indicated Resource , Pine Point Project , நன்று அடிமை ஏரி , வடமேற்கு பிரதேசங்கள் , கனடா , பைன் பாயஂட் , ஓசிஸ்கொ உலோகங்கள் , பொருளாதார மதிப்பீடு , மேற்கு ஸோந் , பைன் பாயஂட் ப்ராஜெக்ட் ,

© 2025 Vimarsana