In case of adverse finding about IE such as not performing duties or complaints of integrity, that Expert would be dropped by the Ministry from the panel itself and a new Expert would be selected by the CPSE and Contractor jointly from the panel for performing the duties of IE.The Dispute Avoidance Mechanism through IE as above shall be adopted by all the Hydro CPSEs executing Power Projects.