PUBLIC SAFETY: Final design for $9.5 million MB Fire Station

PUBLIC SAFETY: Final design for $9.5 million MB Fire Station #2 approved


by Mark McDermott 
The City Council on Tuesday night approved the final design for a new Fire Station #2, a $9.5 million project expected to be completed by 2023. 
The existing Fire Station #2, located at 1400 Manhattan Beach Boulevard, was constructed in 1954. Senior engineer Mamerto Estepa Jr. told the council that the building has numerous deficiencies, including the fact that it is not earthquake-proof, has no changing areas or even bathrooms for female firefighters, is not large enough to fit modern fire apparatus that are not customized to fit within its bay doors, includes no ventilation or extractor systems to help make living quarters safe from the often toxic particles collected on firefighter turnout gear and fire apparatus, and no shop area to work on firefighting apparatus and other equipment. 

Related Keywords

Richard Montgomery , Rudy Meija , Mark Mcdermott , Steve Napolitano , Mamerto Estepa Jr , Manhattan Beach Firefighters Association , City Council On , City Council , Fire Station , Beach Boulevard , Mamerto Estepa , Fire Station Number , General Fund , North Peck Avenue , Begg Pool , Pension Obligation Bonds , Manhattan Beach , Paramedic Engine , ரிச்சர்ட் மாஂட்கம்ரீ , முரட்டுத்தனமான மீஜா , குறி மக்டர்மட் , ஸ்டீவ் னாப்ொலித்தனோ , மன்ஹாட்டன் கடற்கரை தீயணைப்பு வீரர்கள் சங்கம் , நகரம் சபை ஆன் , நகரம் சபை , தீ நிலையம் , கடற்கரை பவுல்வர்டு , தீ நிலையம் எண் , ஜநரல் நிதி , வடக்கு பெக் அவென்யூ , பிச்சை பூல் , மன்ஹாட்டன் கடற்கரை , துணை மருத்துவ இயந்திரம் ,

© 2025 Vimarsana