Red Funnel has had technical difficulties. RED Funnel has resumed its fuller scheduled summer timetable from today (Thursday). The ferry operator has been running a reduced timetable since 20 April due to planned maintenance on Red Falcon, which was carried out to facilitate the installation of a new crankshaft. Additionally, Red Osprey was unexpectedly taken out of service this week due to an exhaust gas leak inside the engine’s water-cooling system. With all three vehicle ferries now back in service, Red Funnel will revert to an hourly service during peak travel times. The daily vehicle ferry timetable effective immediately is: