Roadwork | Community | keysnews.com : vimarsana.com

Roadwork | Community | keysnews.com


• Marathon
A contractor will begin sidewalk repairs for future ramps and crossings, as well as directional bores for electrical conduits at the intersection of U.S. 1 and Sombrero Beach Road (Mile Marker 50.1) in Marathon. Sidewalk detours will be present for pedestrians and cyclists to follow.
• Bertha and 1st streets
The 1st and Bertha streets roadway and drainage improvement project work will consist of reconstruction and resurfacing the two roads, installing a new stormwater collection system on Bertha Street and rehabilitation of the existing stormwater collection system on 1st Street. Due to the underground work and full-depth road reconstruction, there will be lane closures and detours for extended periods.

Related Keywords

, Sombrero Beach Road , Mile Marker , Bertha Street , Old Seven Mile , Overseas Highway , Project , Hurricane Irma , Highway , Fencing , Rehabilitation , Path , Shoulder , Shore , Bridge , Broadway , Completion , Improvement , Ertha , Street , Work , Reconstruction , Detour , Sidewalk , ஸாஂப்ரெரோ கடற்கரை சாலை , மைல் மார்க்கர் , பெர்த்தா தெரு , பழையது ஏழு மைல் , ஓவர்‌ஸீஸ் நெடுஞ்சாலை , ப்ராஜெக்ட் , அத் , ஹோரே , ரிட்ஜ் ,

© 2025 Vimarsana