rd st north to 9 th street south. The project is scheduled for 2024 with a comment period underway now. The presentation lists a project map and video of the plans that have two options being considered for the area between 5 th street and Market Street. Huron Area engineer with the SD Dot Brad Letcher said neither option calls for diagonal parking .