Shell Delivers First Gas from Barracuda Project : vimarsana.

Shell Delivers First Gas from Barracuda Project


Shell Delivers First Gas from Barracuda Project
Shell Trinidad and Tobago, through BG International, a subsidiary of Royal Dutch Shell plc, announces that production has started on Block
29 Jul, 2021, 4:30 am
Shell Trinidad and Tobago, through BG International, a subsidiary of Royal Dutch Shell plc, announces that production has started on Block 5C in the East Coast Marine Area in Trinidad and Tobago. This marks a significant milestone in the delivery of gas both domestically and internationally through Atlantic LNG. Block 5C, known as Project Barracuda, is a backfill project with approximately 25,000 barrels of oil equivalent per day (boe/d) (140 mmscf/d) of sustained near-term gas production with peak production expected to be approximately 40,000 boe/d (220 mmscf/d). It is Shell’s first greenfield project in the country and one of its largest in Trinidad and Tobago since the BG Group acquisition.

Related Keywords

Netherlands , Trinidad And Tobago , Trinidad , Dutch , , Royal Dutch Shell , Heritage Petroleum Company , Sbg International , Bg Group , Shell , Shell Trinidad , East Coast Marine Area , Project Barracuda , Final Investment Decision , நெதர்லாந்து , டிரினிடாட் மற்றும் டொபாகோ , டிரினிடாட் , டச்சு , அரச டச்சு ஷெல் , பாரம்பரியம் பெட்ரோலியம் நிறுவனம் , பி.ஜி. சர்வதேச , பி.ஜி. குழு , ஷெல் , ஷெல் டிரினிடாட் , கிழக்கு கடற்கரை கடல் பரப்பளவு , இறுதி முதலீடு முடிவு ,

© 2025 Vimarsana