Sheridan Avenue Busy with Construction Touchups in May Written by Andrew-Rossi on May 3, 2021 If you’re noticing construction barrels popping up all over Sheridan Avenue, it’s the sign the year-long project is winding down, minus the finishing touches. The Sheridan Avenue rehabilitation project continues chugging along. WYDOT and S&S Builders are eyeing the early summer finish line by this point, but there’s still lots of work to be done. Work will continue on concrete slab replacement, concrete pavement, curb and gutter, double gutter, sidewalk, and ADA upgrades. Last week focuses on the stretch of road from Alger Avenue to Stampede Avenue on the east half of 17th Street.