Solar Philippines to build 2GW solar power project : vimarsa

Solar Philippines to build 2GW solar power project


Solar Philippines to build 2GW solar power project
Out-Law News | 26 Feb 2021 | 11:09 am |
1 min. read
Solar Philippines Biga Corporation is planning to build a 2 gigawatts (GW) solar plant, combining with 6GW battery energy storage system and 600 megawatts (MW) diesel backup in Nasugbu, Batangas, 115 kilometres south west of Metro Manila, Philippines.
The firm has secured a solar service energy contract from Philippines’ energy department for exclusive right to explore, develop and use the solar energy resources.
The project will be developed on an area of 2,000 hectares. The feasibility study for the proposed project started in 2020.
The firm aims to deliver financial closure of the project in the third quarter of 2022. Construction work is scheduled to start in the fourth quarter of 2022 and complete by the third quarter in 2024.

Related Keywords

Philippines , John Yeap , Department Of Energy , Ac Energy , Solar Philippines Power Project Holdings , National Renewable Energy Program , Solar Philippines Biga Corporation , Pinsent Masons , Solar Philippines , Philippines Biga Corporation , Solar Philippines Power Project , Solar Philippines Central Luzon , பிலிப்பைன்ஸ் , துறை ஆஃப் ஆற்றல் , சூரிய பிலிப்பைன்ஸ் பவர் ப்ராஜெக்ட் ஹோல்டிங்ஸ் , தேசிய புதுப்பிக்கத்தக்க ஆற்றல் ப்ரோக்ர்யாம் , சூரிய பிலிப்பைன்ஸ் பிக நிறுவனம் , பின்சென்ட் மேசன்கள் , சூரிய பிலிப்பைன்ஸ் , பிலிப்பைன்ஸ் பிக நிறுவனம் , சூரிய பிலிப்பைன்ஸ் பவர் ப்ராஜெக்ட் , சூரிய பிலிப்பைன்ஸ் மைய லூஸாந் ,

© 2025 Vimarsana