Trains on Netravathi-Mangaluru Central second line from toda

Trains on Netravathi-Mangaluru Central second line from today


Commissioner for Railway Safety conducts inspection of the line, issues track fit certificate
The newly laid second line between Netravathi Cabin and Mangaluru Central Railway Station will be put into operation from Wednesday itself after the Commissioner of Railway Safety (Southern Circle) conducted its statutory inspection and issued the required certificate on Tuesday.
CRS A.K. Rai, along with his deputy E. Srinivas and senior officials from Southern Railway, conducted the statutory inspection of the 1.6 km second line, including the track, level crossings, electrical and signal installations and other equipment between 9 a.m. and noon.
Divisional Railway Manager of Palakkad Division Trilok Kothari, who accompanied the inspection team, told

Related Keywords

Mangaluru , Karnataka , India , , Palakkad Division Trilok Kothari , Southern Railway , Divisional Railway , Railway Safety Southern Circle , Netravathi Cabin , Mangaluru Central Railway Station , Railway Safety , Southern Circle , Railway Manager , Ullal Bridge , Netravathi River , Mangaluru Central , Level Crossings , Road Over , Route Relay Interlocking System , Electronic Interlocking , Railway , மங்களூரு , கர்நாடகா , இந்தியா , பழக்கத் பிரிவு திரிளோக் கோத்தாரி , தெற்கு ரயில்வே , பிரிவு ரயில்வே , ரயில்வே பாதுகாப்பு தெற்கு வட்டம் , மங்களூரு மைய ரயில்வே நிலையம் , ரயில்வே பாதுகாப்பு , தெற்கு வட்டம் , ரயில்வே மேலாளர் , உள்ளால் பாலம் , மங்களூரு மைய , நிலை குறுக்குவெட்டுகள் , சாலை ஓவர் , பாதை ரிலே இன்டர்லாக் அமைப்பு , மின்னணு இன்டர்லாக் , ரயில்வே ,

© 2025 Vimarsana