May 3, 2021 By Jessica Mathews / news@whmi.com A proposal for engineering services related to the rehabilitation of the Hay Creek Bridge on the Lakeland Trail in Hamburg Township has been approved. The bridge was originally built as a train bridge in the late 1800âs and now serves as a pedestrian/maintenance access bridge for the Lakeland Trail. The existing walking surface and guardrails are in need of replacement. At a virtual board meeting last month, members voted to approve the engineering proposal at a fixed fee of $14,000. Supervisor Pat Hohl told the board five years ago, they identified a serious need to address the decking on the Mike Levine Trail Bridge west of Chambers Road over Hay Creek, noting the structure is good but the decking is bad.