Detailed text transcripts for TV channel - CNN - 20100408:14:16:00
In other words, we'll have 1700 cfm ventilating this area with double the quantity. in addition, we talked last evening about the importance of putting a bore hole in near that refuge chamber on long wall 22 section. that bore hole is down 90 feet. it's going to have to go down 1100 feet. the drill that is being used at the refuge chamber is also the drill that was used at bore hole one. the drill that basically seemed to do a very quick job for us and we're hoping to get that into the mine naturally, as soon as we can. >> bore hole -- i don't know. i'm very hesitant on how i refer to the bore...