State Gas Limited (ASX:GAS) Drilling Rig mobilisation to Reids Dome Gas Project
State Gas Limited (ASX:GAS) Drilling Rig mobilisation to Reids Dome Gas Project Drilling Rig mobilisation to Reids Dome Gas ProjectBrisbane, Dec 22, 2020 AEST (ABN Newswire) - State Gas Limited ( ASX:GAS) advises that on 19th December Target Depth of 1212m was reached at Nyanda 7. The drilling showed net coal of over 30 metres with very encouraging gas readings on drilling. Nyanda 7 is presently being under-reamed after logging. The well will be cased to total depth and the casing cemented to surface. After which the rig will move to Nyanda 8. This should occur by the end of this week...