Baxter alters project to sidestep MnDOT
In 2011, Baxter reported MnDOT completed a project along Highway 371 that left multiple intersections experiencing flooding and unsafe driving conditions during rainstorms.
Stay updated with breaking news from Design Road. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.
In 2011, Baxter reported MnDOT completed a project along Highway 371 that left multiple intersections experiencing flooding and unsafe driving conditions during rainstorms.
花蓮地檢署偵辦0402台鐵太魯閣號事故,先前已起訴承包商李義祥等人,今天再針對台鐵局花蓮工務段潘姓主辦工程司、中棪專案管理顧問公司郭姓專案經理,依過失致死等罪嫌偵查終結追加起訴。花檢指出,被告兩人明知工地應確實設置安全防護措施,避免物品掉落鐵軌而影響鐵路行車安全,兩人實際上多次前往現場督導及稽核,涉嫌過失致死罪嫌。花蓮地檢署指出,台鐵局花工段潘姓主辦工程司、郭姓專案經理兩人對於本案工程的工地安全衛生(å�...
Written By: Brainerd Dispatch | × Crow Wing County Sheriff SUSPICIOUS — Report at 10:18 p.m., Saturday, May 1, of a suspicious vehicle on the 7000 block of Design Road, Baxter. Report at 4:17 p.m., Sunday, May 2, of a suspicious vehicle on the 7500 block of Wise Road. Driver was revoked and a citation was issued. Report at 7:13 a.m., on Saturday, of a suspicious person on the 6500 block of Highway 169. A person was contacted and deputies took them to their place of residence. Report at 1:58 p.m., Sunday, May 2, of a suspicious vehicle on the 7800 block of County Road 127. Deputies locat...