BHEL Bhopal designed, fabricated guide apparatus for PH Project
BHEL Bhopal has successfully designed, fabricated, machined and assembled its largest ever Guide Apparatus for Polavaram Hydroelectric Project. The Guide Apparatus assembly is a major component of the Hydroelectric Project which serves as water inlet through its 24 guide vanes each weighing 4 MT