MetroLink terminus should be moved from southside stop to city centre, local FF TD tells hearing
Jim O’Callaghan said it is “highly unusual” that the MetroLink “doesn’t terminate in a city centre location”.
Source: thejournal.ie
Stay updated with breaking news from Draft Railway Order. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.
Jim O’Callaghan said it is “highly unusual” that the MetroLink “doesn’t terminate in a city centre location”.
The MetroLink would run north to south, featuring 16 new stations from Swords to Charlemont.
An Bord Pleanála has confirmed that the oral hearing into the estimated €9.5bn Metrolink project for Dublin will begin next month.
The oral hearing will provide a platform for third parties to outline their concerns over aspects of the estimated €9.5 billion project.
Scheme is to cost an estimated €9.5 bn