Answer to Kampala's flooding lies in defeating greed
The authorities must be shaken out of that costly complicity, held to account and asked to show more than politically-correct token interventions
Stay updated with breaking news from Drainage Master. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.
The authorities must be shaken out of that costly complicity, held to account and asked to show more than politically-correct token interventions
Explained: The loss of wetlands, concretization, an aging drainage system, and stormwater mixing with sewage networks, contribute to the problem of waterlogging
Explained: Aging pipelines, increased population and unauthorised construction have resulted in clogged stormwater drains
BLUE MATRIX CONSULTANCY is a Grade-I Consulting Company in Ethiopia in the fields of Water Supply Sanitation and Environmental Engineering, and Environmental Impact Assessment Studies.
SunStar May 03, 2021 The Department of Public Works and Highways (DPWH) Central Visayas begins its Detailed Engineering Design (DED) process for three major infrastructure projects in Cebu City, poised for completion in 2037. They include the 1.1-kilometer flyover from Osmeña Blvd. corner N. Bacalso Ave. to P. del Rosario St., corner Leon Kilat; a 1.2-kilometer flyover from N. Bacalso Ave. to V. Rama; and a 900-meter underpass from South Road Properties to Mambaling Road. Meanwhile, still reeling from the apparent haphazard ways the agency had implemented the Mambaling underpass...