Next sections of £126.75m bridge set to arrive in Lowestoft
Cranes are being installed ahead of the arrival of the next sections of a long-awaited third crossing in a coastal town.
Stay updated with breaking news from Farrans Construction. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.
Cranes are being installed ahead of the arrival of the next sections of a long-awaited third crossing in a coastal town.
Another major milestone has been marked in the construction of a long-awaited third crossing.
Farrans is the main contractor on the 110m span steel cable stayed opening swing bridge, which was designed by Jacobs, for Glasgow City Council as part of
The scope of the framework has also been changed, with National Highways saying that works from Road Investment Strategy 3 (RIS3), 2025 – 2030, may now be
Installation of the next two huge sections of a long-awaited third crossing is due to begin soon.