Live Breaking News & Updates on James wech

Stay updated with breaking news from James wech. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.

Light at end of tunnel in mission to save vital pipeline


Premium Content
Subscriber only
A team of contractors has completed a risky underground mission to remove more than 60 tonnes of unstable rocks which threatened to damage one of the Coast’s most important pipelines.
Working through harsh conditions in a pitch black tunnel, contractors manually removed more than 60 metric tonnes of rock and soil from an underground tunnel, moving half a tonne at a time.
The 2.5-kilometre tunnel runs beneath the Blackall Range and houses a pipeline which transports water from Baroon Pocket Dam to the Landers Shute Water Treatment Plant in Palmwoods.
The pipeline, which is a critical component in southeast Queensland’s water grid, has the ability to transport 180 megalitres to the treatment plant.

Blackall-range , Queensland , Australia , Palmwoods , Daniel-roche , Brad-mearns , Trudy-wallington , Phil-benson , James-wech , Baroon-pocket-dam , Landers-shute-water-treatment-plant