Pantoro confident Mainfield system will extend Norseman mine life with results of up to 5.7 metres at 35.85 g/t gold Results suggest that high-grade mineral resources and ore reserves from Mainfield will be included in future optimisations of the phase one mine plan. Section of interval from hole MARCD21_058 that returned 5.7 metres at 35.85 g/t gold, including 1.4 metres at 141.57 g/t. Pantoro Ltd (ASX:PNR) (FRA:RKN) is confident that the historic Mainfield system at Norseman Gold Project in Western Australia will extend mine life, after receiving high-grade drilling results up...