Eco-restoration of Adyar in full swing
Updated: February 19, 2021 01:08 IST Flood protection walls have been built at several vulnerable stretches; 10 lakh cubic metre silt removed Share Article AAA Clearance work continues: The width of a stretch of the Adyar has been increased from 80 m to 400 m near the Thiru. Vi. Ka. bridge. | Photo Credit: RAGHUNATHAN SR Flood protection walls have been built at several vulnerable stretches; 10 lakh cubic metre silt removed The Water Resources Department is set to complete work on desilting a portion of the Adyar as part of its eco-restoration project by this month-end. The 25 km stret...