Power shut down
Power shut down JAMMU: Superintending Engineer (Distribution) JPDCL, O&M Circle Kathua has informed that for erection of poles by TKC M/S Transrail Limited under CSS Scheme PMDP (Urban), the power supply to BB Town and Teli Basti will remain affected on January 31, February 02 and 04 from 10 am to 4 pm. Superintending Engineer, O&M Circle Jammu JPDCL has informed that for HT stringing, LT cable laying and charging, the power supply to Residency Road, Christian Colony, Raghunath Bazar, DPS Road and their adjoining areas will remain affected on February 01, 03 and 05 from 9 am to 2 pm. Similar...