ASPI seeks nod of ERC for Visayas transmission facility
Aboitiz Solar Power Inc. (ASPI) has proposed the construction of a transmission facility to connect its 137.48-megawatt peak (MWp) Calatrava solar power project to the Visayas grid via the substation of the National Grid Corporation of the Philippines (NGCP). In a filing with the Energy Regulatory Commission (ERC), ASPI said…