Dokken: Winter road to Northwest Angle should be ready within a week, plow truck driver says
Organizers have said they want a consistent 15 inches of ice at minimum before opening the road to the public. While the thickness minimum is close, a warm snap early this week caused the ice to shift in some areas, which happens with drastic temperature swings. That, in turn, can create cracks, which need time to heal.