Zephyr Energy commences production, experiences delays at Utah's Paradox basin
In early April 2023, a significant well control issue arose in which hydrocarbons flowed from the well in an uncontrolled manner. Currently,t he State 36-2 well remains static and under control, and Zephyr is in the process of pulling the production tubing out of the hole, as some joints were compressed/compromised or stuck due to the high pressures experienced during the well control incident and subsequent well control efforts.