Grand Canal Dock: Lowered Water Levels for Works on Camden Sea Lock
The water level in Grand Canal Dock will be lowered by approximately 400mm to accommodate the works from Monday 3 April
Stay updated with breaking news from Personal Flotation. Get real-time updates on events, politics, business, and more. Visit us for reliable news and exclusive interviews.
The water level in Grand Canal Dock will be lowered by approximately 400mm to accommodate the works from Monday 3 April
Ten vessels are presently stored by Waterways Ireland at Shannon Harbour, Co Offaly and at Munster Harbour near Portumna
To enable the repair works to be completed, the navigation channel will be closed for two hours on the morning of Thursday 6 April
All vessels between Locks 26 and 27 — including the branch line to Tullamore Harbour — should relocated from that canal level by Monday 27 March
Works between the locks at either end of Wilton Terrace will commence Monday 3 April and continue for around eight weeks