vimarsana.com

Latest Breaking News On - Pnrr - Page 1 : vimarsana.com

Simtel Gets RON61M Funding via PNRR to Build Giurgiu Photovoltaic Power Plant

Romanian engineering and tech company Simtel Team, a national leader in renewable energy, has obtained a RON60.6 million non-reimbursable funding under the National Recovery and Resilience Plan (PNRR).

CNAIR starts all the projects in PNRR, Constanţa Port - problems in accessing european funds

One warm, the other cold at the Ministry of Transport, as long as CNAIR managed to start all the projects financed from the National Recovery and Resilience Plan, but the Port of Constanţa has problems accessing European money, according to the statements of Minister Sorin Grindeanu.

Renewable energy project in Călăraşi, started by Tenaris Silcotub SA

In the conditions of the volatility of the energy market after the start of the war in Ukraine by the Russian Federation two years ago, the company Tenaris Silcotub SA will build a photovoltaic park in Calarasi, with a nominal power of 19.8 Megawatts, which will provide 10% of the energy consumption of the production capacities of the respective company, Mihaela Popescu, the president of the company from our country, announced yesterday, during a press conference.

9 9 billion lei contracts for passenger trains and locomotives

Railway passenger transport operators will benefit from 16 locomotives and 119 new trains, after the contracts worth a total of 9.9 billion lei will be completed by the signatory companies, Sorin Grindeanu, Minister of Transport and Infrastructure, said yesterday. after the signing of the contract for the purchase of 62 regional electric frames, between the Railway Reform Authority (ARF) and the Polish company PESA.

© 2024 Vimarsana

vimarsana © 2020. All Rights Reserved.